Where should we install the industrial air cooler

If we want the evaporative air cooler have good cooling effect , and it must also ensure that the air cooler equipment is safe and stable without any safety hazards such as falling. Therefore, the choice of installation location is also very important. It must be combined with the structure of the factory building and installation conditions. Therefore, when a professional industrial air cooler installation company designs the installation scheme of the main unit, Generally consider comprehensively to determine the installation location of the main unit. Then what problems should we pay attention to when installing the environmental protection air conditioner!

Installation method of industrial workshop air cooler:

Industrial air cooler are generally installed on the ground, side walls, and roofs. Of course, if these installation conditions are not met in some installation environments, relatively poor indoor installation methods will be adopted, using 40*40*4 angle iron frames and The bolts of the wall or window panel are connected in a field match, and the rubber pad between the air duct and the angle iron frame is used to prevent vibration, and all the gaps are sealed with glass or cement mortar. The air supply elbow should be prepared according to the requirements of the drawings, and the cross-sectional area should not be less than 0.45 square meters. When installing the air duct, install the hanger rod on the installation base frame so that all the weight of the air duct is hoisted on the base frame.

https://www.xikooaircooler.com/projects/injection-molding-workshop-air-cooler-cooling-system/

skills requirement:

1. The welding and installation of the tripod bracket should be firm;

2. The maintenance platform must be able to support the weight of the unit and maintenance personnel;

3. The host must be installed horizontally;

4. The section of the main engine flange and the air supply elbow must be flush;

5. All external wall air ducts must be waterproofed;

6. The junction box of the host must be installed against the temple for easy maintenance;

7. A waterproof bend should be made at the junction of the air pipe elbow to prevent water from flowing into the room.

 

Precautions for industrial air cooler installation:

1. The surrounding environment where the main unit is installed should keep the air clear and fresh. It should not be installed in places with odor, peculiar smell gas, or oil fume exhaust outlets, such as toilets, kitchens, garbage dumps, etc., so as to ensure the air quality of the environmentally friendly air conditioner Always clean and cool with no peculiar smell.

2. When installing the main unit, the frame should be welded and installed firmly, especially when the main unit is hung on the side wall, this must be done well to ensure the safety of the environmental protection air conditioner main unit.

3. After the installation method and location are determined on site, it is necessary to measure the specific size of the host installation location, and determine whether the air duct enters the room through the wall or through the window position. If the interior design post supplies air, it is necessary to arrange ventilation ducts. Attention should be paid to whether there are obstacles at a height of 2.5m from the ground, and whether the ventilation ducts and air duct hangers can be arranged smoothly.

4. Civilized construction should be achieved during installation and construction, not only to ensure the safety of the installers, but also to ensure the safety of personnel and property around the installation environment of the owner’s air cooler host.